Site C Cultural Centre Immersive Theatre Experience
British Columbia Hydro and Power Authority
via CanadaBuys
British Columbia Hydro and Power Authority
via CanadaBuys
British Columbia Hydro and Power Authority is seeking vendors for: Site C - Cultural Centre Immersive Theatre Experience. For complete details including scope, requirements, and submission instructions, please visit the original source link below.
This bid is 75% technology related
Highly relevant to the tech industry
Immersive theatre experience likely requires interactive digital media, VR/AR software, multimedia programming, or web-based immersive tech relevant to software developers and system integrators. Not construction or physical build despite cultural centre context; no sole source mentioned.
Deadline: May 4, 2026 at 12:00 AM ET
Always verify deadlines on the original source.
Is the original source link not working? Let us know so we can fix it.
We use AI to analyze and classify bid information. Please verify details at the original source.
Ref No.
TB-039808