Tableland Switching Station to Boundary Dam Fibre Installation (Updated)
Saskatchewan Power Corporation
via Saskatchewan Power Corporation
Saskatchewan Power Corporation
via Saskatchewan Power Corporation
This opportunity involves procuring and installing fibre optic cabling to establish a dedicated network link between Tableland Switching Station and Boundary Dam. The scope centers on deploying telecommunications infrastructure for reliable, high-capacity data connectivity between the two utility sites.
This bid is 35% technology related
Has some technology elements
This is a tech opportunity because it requires specialized network and telecom vendors to supply, integrate, and implement fibre optic systems, directly aligning with the Network & Telecom category.
Deadline: Jul 23, 2026 at 5:00 PM ET
Always verify deadlines on the original source.
Is the original source link not working? Let us know so we can fix it.
We use AI to analyze and classify bid information. Please verify details at the original source.
Ref No.
TB-084180