Network & Telecom Saskatchewan Reviewed

Tableland Switching Station to Boundary Dam Fibre Installation (Updated)

SA

Saskatchewan Power Corporation

via Saskatchewan Power Corporation

Posted Jul 14, 2026
Due Jul 23, 2026

About This Opportunity

This opportunity involves procuring and installing fibre optic cabling to establish a dedicated network link between Tableland Switching Station and Boundary Dam. The scope centers on deploying telecommunications infrastructure for reliable, high-capacity data connectivity between the two utility sites.

This bid is 35% technology related

Has some technology elements

Why we classified this as tech

This is a tech opportunity because it requires specialized network and telecom vendors to supply, integrate, and implement fibre optic systems, directly aligning with the Network & Telecom category.

How to Access This Bid

This bid is hosted on Biddingo. Click View Original Source above to open Saskatchewan Power Corporation's bids page.
Find this bid in the list — look for the same title.
Click the bid to see its full details. Biddingo may ask you to sign in or create a free account.

Time Remaining

-- days
--
Hours
--
Minutes
--
Seconds

Deadline: Jul 23, 2026 at 5:00 PM ET

Always verify deadlines on the original source.

Is the original source link not working? Let us know so we can fix it.

Broken link reported

We use AI to analyze and classify bid information. Please verify details at the original source.